Home > Construction > Spring Progress at the Tara Dzong
tara dzong looking south

With a dry winter, the construction crew has made great strides in putting up the Tara Dzong’s three floors.

tara dzong looking south

Looking from the direction of the Sangdo Palri Temple

truss

Truss being lowered into place

ruff trusses sunset

Roof trusses and the setting sun.

southwestern exposure of tara dzong

The retreat room side of the Dzong, showing two floors of retreat rooms and their decks, with shrine room above.

view out of retreat room at tara dzong

A view out one of the second floor retreat room.